Rollan

Rollan 40 NT complete set for wooden door leaves * Sliding door fitting for timber leaves

Rollan 40 NT wood
  • Sliding door fitting for timber leaves with up to 40 kg leaf weight
  • Needs one complete set per leaf
Contact us

Application Areas

  • For leaf weights up to 40 kg
  • For wall and ceiling installation
  • For single-leaf metal and timber doors

Technical data

Rollan 40 NT complete set for wooden door leaves
Leaf material Plastic, Metal, Wood
Leaf weight (max.) 40 kg
Number of leaves 1-leaf, 2-leaf
Leaf width (min.) 500 mm
Leaf width (max.) 1420 mm
Test cycles 25000
Corrosion protection class 1
Type of installation Wall, Ceiling
Access for all according to DIN 18040

Downloads

Variants & Accessories

Contact

GEZE Central +32-15-21-11-28 GEZE Service +32-15-42-20-26